Case Studies

Our clients seek our assistance because they know W. L. Gary Company will find a solution for the challenge they are facing. See how we have helped our construction clients.

Decentralizing the Heating System for Efficiency

Key Characteristics

  • Decentralizing heating system
  • Retrofit
  • Occupied space
  • High efficiency boilers

 

New and Improved High School with the Help of BIM

Key Characteristics

  • BIM
  • Seeking LEED Gold
  • Completed on time

 

Keeping a Vocational School in Session During Renovation

Key Characteristics

  • Full occupancy during construction through swing space
  • Student and faculty safety

 

Stable and Energy Efficient Environment for Simulator

Key Characteristics

  • Design Assist
  • Stable environment
  • Temperature and humidity control critical
  • Rooftop unit with Heat recovery
  • Applying for LEED certification

 

Complete Boiler Replacement over the Summer

Key Characteristics

  • Design/Assist
  • Strict time table
  • Coordinating with another construction project on site
  • High Efficiency Boilers

Stay in Touch

Send us a note:
GaryCompany@wlgary.com
Stay up-to-date:

Join Our Email List