Case Studies
Our clients seek our assistance because they know W. L. Gary Company will find a solution for the challenge they are facing. See how we have helped our construction clients.
Decentralizing the Heating System for Efficiency
Key Characteristics
- Decentralizing heating system
- Retrofit
- Occupied space
- High efficiency boilers
New and Improved High School with the Help of BIM
Key Characteristics
- BIM
- Seeking LEED Gold
- Completed on time
Keeping a Vocational School in Session During Renovation
Key Characteristics
- Full occupancy during construction through swing space
- Student and faculty safety
Stable and Energy Efficient Environment for Simulator
Key Characteristics
- Design Assist
- Stable environment
- Temperature and humidity control critical
- Rooftop unit with Heat recovery
- Applying for LEED certification
Complete Boiler Replacement over the Summer
Key Characteristics
- Design/Assist
- Strict time table
- Coordinating with another construction project on site
- High Efficiency Boilers
Stay up-to-date: