West End 25th

LEED Projects

W. L. Gary Company’s construction team has years of experience constructing mechanical and plumbing systems in LEED Rated buildings. General contractors and building owners have relied on us to be an integral part of their team during all stages of the building process.

Cambria Suites, City Market at O

Scope: 200 room hotel

Contract Type: Plan and Spec
Location: Washington, DC
CM/GC: Clark Construction
Project Status: Under Construction
LEED: LEED Silver

MRP Realty, 7940 Jones Branch Dr

Scope: 11 story shell and core office building and 6 story above ground garage

Contract Type: Plan and Spec
Location: McLean, VA
CM/GC: Harvey Cleary
Project Status: Under Construction
LEED: LEED Gold

University of Maryland: President’s Residence and Event Center

University of MarylandScope: New residence for the University President with an attached event center

Contract Type: Design Assist, GMP
Size: 14,000 sq ft
Location: College Park, MD
CM/GC: Forrester Construction
Industry: Higher Education
Project Status:
 Completed August 2012
LEED: Seeking LEED Gold

Anacostia Senior High School

Anacostia HS under constructionScope: Complete renovation and addition of existing school

Contract Type: Design Assist, GMP
Size: 240,000 sq. ft
Location: Washington, DC
CM/GC: Forrester Construction
Industry: K-12
Project Status: Completed August 2012
LEED: Seeking LEED Silver

Washington DC VA Medical Center: Community Resource and Referral Center

Scope: Full mechanical and plumbing demo and installation of the VA community outreach center

Contract Type: DBB
Size: 16,000 sq ft
Location: Washington, DC
CM/GC: Turner Special Projects
Industry: Healthcare
Project Status: Completed April 2012
LEED: Seeking LEED Silver

Washington Adventist University: Music Building

Scope: Coordinate and install HVAC, Controls, and Plumbing

Contract Type: Plan and Spec
Size: 17,000 sq ft
Location: Takoma Park, MD
CM/GC: Forrester Construction
Industry: Higher Education
Project Status: Completed December 2011
LEED: Seeking LEED Silver

H.D. Woodson High School

Scope: Fully coordinated and installed plumbing

Contract Type: Plan and Spec, BIM
Size: 50,000 sq. ft
Location: Washington, DC
CM/GC: Hess Construction
Industry: K-12
Project Status: Completed August 2011
LEED: Seeking LEED Gold

DC Library: Petworth Library

Petworth LibraryScope: Full mechanical and plumbing for renovation

Contract Type: Design Assist
Size: 12,000 sq ft
Location: Washington, DC
CM/GC: GCS-SIGAL
Industry: Government
Project Status: Completed May 2011
LEED: Seeking LEED Silver

American University: SIS Building

Scope: Coordinate and install HVAC, Controls, and Plumbing

Contract Type: Plan and Spec
Size: 70,000 sq ft
Location: Washington, DC
CM/GC: Whiting Turner Construction
Industry: Higher Education
Project Status: Completed May  2010
LEED: LEED Gold

West End 25 Apartments

West End 25thScope: Fully Coordinated Plumbing and HVAC

Contract Type: Plan and Spec
Location: Washington, DC
CM/GC: Davis Residential
Industry: Residential
Project Status: Completed April 2010
LEED: LEED Gold

Walker Jones Education Campus

Scope: Coordinate and Install HVAC, Controls, and Plumbing

Contract Type: Plan and Spec
Size:
 120,000 sq. ft
Location: Washington, DC
CM/GC: Forrester Construction
Industry: K-12
Project Status: Completed August 2009
LEED: Seeking LEED Silver

Construction Success

Stable and Energy Efficient Environment for Simulator

Key Characteristics: Design Assist; Stable environment; Temperature and humidity control critical; Rooftop unit with Heat recovery; Applying for LEED certification Challenge: When creating a building to house a flight simulator, numerous factors had to be taken into account.  The client was not only concerned about creating a stable environment for highly sophisticated computerized equipment, but…

Learn more

Construction Success

H. D. Woodson HS

New and Improved High School with the Help of BIM

With the use of BIM, W. L. Gary Company, Inc. was able to coordinate and tackle the intricate piping systems in the new environmentally friendly H. D. Woodson High School, including a cistern system, a swimming pool, and a Green roof. Key Characteristics: BIM; Seeking LEED Gold Certification; Completed on time Challenge: A local high…

Learn more

Stay in Touch

Send us a note:
GaryCompany@wlgary.com
Stay up-to-date:

Join Our Email List